Last September 12th 2018, the CONTRACT OF PROJECT DEVELOPMENT CONSULTANCY for the LOC NINH HUNG HAI SOLAR POWER PLANT- Capacity 200MW was signed between Hung Hai Group Joint Stock Company and Arbro Consulting.